News

In South Africa: Eskom CEO Blames Stage 6 Load-Shedding on Majuba Failures

todayFebruary 24, 2025

Background

In South Africa, Eskom CEO Dan Marokane says stage 6 load-shedding was triggered by multiple unit failures at Majuba power station in Mpumalanga after a transformer overload. He confirmed the issue is a structural and technical setback, but assured that isolation measures are in place. Despite further unit trips at Medupi and Camden, Eskom remains

Written by: Madeline

Similar posts

News

Namibia on course to register HIV prevention injection

By: Selma Taapopi Namibia has fast-tracked the registration of lenacapavir, an injectable HIV prevention treatment administered twice a year. Lenacapavir is a pre-exposure prophylaxis (PrEP) administered as a long-acting injectable formulation, in contrast to oral tablets that require daily administration. The ministry on Thursday announced the progress on its Facebook […]

todayJanuary 29, 2026


Contact Us

Fresh-FM-small-logo
Fresh-FM-phone-icon
Office:
Phone: 083 000 1000
Fresh-FM-phone-icon
Studio:
Phone: 083 000 1029 
Telegram: 083 000 1029
WhatsApp: 083 000 1029
SMS: 1029 (N$2 / sms)
Fresh-FM-marker-icon
Location: 3rd Floor Old Power Station Armstrong Street, Windhoek